left side stuff There are 18 existing storage reservoirs in EVWD’s water system ranging from 0.07 million gallons (MG) to 4 MG in capacity. Per the District’s 2019 Water System Mater Plan, it was recommended that seismic retrofitting be performed on all EVWD tanks.
Current Phase
Estimated Completion
Total Project Cost

There are 18 existing storage reservoirs in EVWD’s water system ranging from 0.07 million gallons (MG) to 4 MG in capacity. Per the District’s 2019 Water System Mater Plan, it was recommended that seismic retrofitting be performed on all EVWD tanks. This proposal will cover Phase I of two for a FEMA Hazard Mitigation Grant Program (HMGP) awarded to the District. Phase I portion of the work will consist of engineering analysis, planning, and bid package preparation for the construction of the Phase II portion. 

Total Project Cost

$660,000 (Grant Funded)


Project type

Water


Current Phase

Planning and Design


Projected Completion

June 2025